ESDIS Weekly Metrics: March 24, 2025

Image

Note:

  1. The volume distributed to end users per day, as a running average over the last 4 weeks, is 2.419 times the volume added to the archive per day.

 

LANCE Data Latency

Image

Note:

Higher product latencies for:

  • OMI-AURA, on March 18, 2025, due to a database problem because of a side effect from system maintenance.
  • OMPS-SNPP, on March 18, 2025, due to a database problem because of a side effect from system maintenance.
  • SMAP L-BAND RADIOMETER-SMAP, on March 18-19, 2025, due to planned downtime for system maintenance.
Image
Image

Note:

  1. Latency for a data granule is defined as the time taken from the midpoint between the start and end of acquisition of the data for that granule to the granule’s being ready online for users to download.
  2. Duration covered by the data for a granule is defined differently for different instruments (e.g., MODIS granules are 5 minutes long while OMI NRT granules are 13 to 136 minutes long).
  3. Over the last 4 weeks, over 95% of NRT data requests for all instruments except for 3 instruments (OMPS-SNPP, SMAP L-BAND RADIOMETER-SMAP, and VIIRS-SNPP-Land) were satisfied within 3 hours. OMPS-SNPP, SMAP L-BAND RADIOMETER-SMAP, and VIIRS-SNPP-Land over 94%, 76%, and 79% of the NRT data requests were satisfied within 3 hours, respectively.
  4. MOPITT in Safe Mode: On February 1, 2025, the Terra Measurement of Pollution in The Troposphere (MOPITT) instrument went into safe mode. While in safe mode, there will be no MOPITT science data collected. As of March 31, 2025, the MOPITT Subsetter will be decommissioned.

Global Imagery Browse Services (GIBS)

Image

Worldview

Image